Home Sitemap ThyssenKrupp Group Privacy Policy
ThyssenKrupp Steelcom - A company of ThyssenKrupp Services ThyssenKrupp Site
Contact
About Us Products Services Useful Resources Contact Us Equipment for Sale and Hire
 

 Go to Driving the Future Piling Symposium Video Footage

Driving the Future
Piling Symposium
Video Footage

 

 

Job Reports > Impact Hammers > Brisbane Wharf

Brisbane Wharf
Queensland
Wharf Extension


Albem Pty Ltd has been commissioned by the Port of Brisbane Corporation to construct Wharf 9 at the Port’s Fisherman Islands facility in Brisbane.

Albem is using Steelcom’s HH1146 drop hammer in 14 tonne configuration to drive over 300 piles ranging in size from 900mm to 1200mm in diameter and driven to approximately RL -40.000. Overall pile length is up to 50m. Work is expected to be completed mid 2005.

This hammer is available for sale at the completion of this contract. See Used Equipment Sales for more information or Contact Steelcom.

 

Albem Pty Ltd is using Steelcom’s HH1146 drop hammer in 14 tonne configuration to drive over 300 piles ranging in size from 900mm to 1200mm in diameter and up to 50m in length. Albem Pty Ltd is using Steelcom’s HH1146 drop hammer in 14 tonne configuration to drive over 300 piles ranging in size from 900mm to 1200mm in diameter and up to 50m in length.

 

 


  Privacy Policy | Sitemap
      Copyright © by ThyssenKrupp Steelcom