Job Reports > Sheet Pile > Holdfast Shores

Holdfast Shores
Glenelg South Australia
60 Berth Boat Basin


The Holdfast Shores Consortium of which Baulderstone-Hornibrook were a lead member, was responsible for the Holdfast Shores Development in Glenelg, South Australia.

This involved the construction of a 60 berth boat basin for which Steelcom supplied LX32 sheet pile to form a hard vertical face.

The boat basin bed level is at RL –6.0 AHD and the adjoining building levels at RL 3.0 ADH, which was achieved using sheet-piles that were also incorporated into the adjoining buildings’ basement structures.

The sheet-piling solution provided the physical “traditional dock” look the architects desired. The sheet-piling solution also assisted to preserve precious land when compared to battered slop with rock revetment.

 

Holdfast Shores, Glenelg South Australia, 60 Berth Boat Basin for which Steelcom supplied LX32 sheet pile to form a hard vertical face. Holdfast Shores, Glenelg South Australia, 60 Berth Boat Basin for which Steelcom supplied LX32 sheet pile to form a hard vertical face.

 